Don’t sweat the small stuff

Someone failed to explain to me when I decided to start my blog about renovating that I would suddenly not have the time to blog because I’d be too busy doing the thing I was supposed to be writing about! 

Between renovating and managing a crazy work schedule our social lives have disappeared into dust (perhaps that’s why there’s so much of it on my floor!) and the renovating itself has becoming an all encompassing being which invades my personal life, dinner conversations and relationship! However, every story has an end! And we are quickly approaching a foreseeable end – for the bathroom and laundry at least! 

In recent weeks, walls were installed and tiles laid so it’s been all systems go on the exciting times but not without a hiccup or two. 

So, I took a week off work after the walls went up to open the house for the tiler and plod around painting and doing other odd bits and bobs. On day two our tiler, a delightfully polite man of afghani descent with a love of tim tams (a pack a day!) and cans of V Energy drink, (politely) informs me after trying to tile the wall in the delicious but painfully small subway tiles I have chosen that the walls are too bowed to lay them and that the walls need to come down, be packed and reinstalled. You can imagine my dismay and absolute desperation to know how much work this could possible be, how much of a delay this could cause to our potential move in date and how seriously out of my depth I am to deal with such a dilemma! 

Thankfully, a team of problem solvers consisting of plaster, tiler and boy all came together to find a practical and reasonable solution to the wall debacle! With some additional gyprock sheets, base coat and some talented plastering magic, the problem was solvered – as they say – and things were back on track! 

Our poor tiler was very patient in the laying of the delicately small tiles and finicky patterns (because the mood board doesn’t exactly explain to you just how labour intensive the look you have your heart set on might be!). I have a feeling that when his wife asked ‘how was your day today?’ at dinner time each evening that he’d happily tell her that he was at the shittest job he’d ever done! Oops! 

Our second mistake in this same week was to underestimate the length of time it would take to tile said ridiculously small tiles. Almost two full weeks were taken to screed, waterproof, tile floors and walls to the ceiling, grout and silicone. 

But boy, was that two weeks worth it! 

 Who doesn’t love a checkered floor?   

Welcome to the open shower on the left and the proposed vanity on the right. How gorgeous are those tiles?!  What we have ended up with is beyond our wildest dreams. It looks beautiful and more stunning than I could have ever imagined! I’m ecstatic with the end result and once fittings and fixtures are installed, we really will have something special! 

So, don’t sweat the small stuff! Everything can be fixed one way or another. And if you have a vision, don’t compromise. The end result will definitely be worth it! 

2 thoughts on “Don’t sweat the small stuff

Leave a comment